How to write a project status update with Rovo in Atlassian Projects

Open the project, start a new update and choose Draft with Rovo. Check the draft against what you know, edit it, pick the status and post. About 5 minutes. AI must be switched on for the Projects app.

Verified 8 Oct 2026 6 steps Checked against the current interface
Guide me Steps show on your own Atlassian page. Needs the free Pinafly extension.

Before you start

A Standard, Premium or Enterprise plan, with AI switched on for the Projects and Goals apps by an admin.

  1. 1

    Open the project

    In Atlassian Home, open Projects and click the project you are updating.

  2. 2

    Start a new update

    Click to write an update for this week.

  3. 3

    Choose Draft with Rovo

    Rovo reads recent activity from the work linked to the project and writes a draft.

  4. 4

    Check the draft

    Read every line against what you know. Rovo only sees linked work, so it misses decisions made in meetings and chat. Delete anything wrong and add what it missed.

  5. 5

    Set the status

    Choose On track, At risk or Off track. Rovo may suggest one; the call is yours.

  6. 6

    Post the update

    Post it. Followers of the project and its goal see it.

If it does not work

There is no Draft with Rovo option. An organisation or site admin must switch AI on for the Projects and Goals apps in Atlassian Administration (Apps, then AI settings). The Free plan does not include Rovo.

The draft is thin or generic. Rovo drafts from linked work. Link the Jira work items and Confluence pages behind the project, then draft again.

How we checked

Verified 8 Oct 2026 against the live interface.